Complete fit-out and design of educational workshops

"Firstly, I just wanted to give some positive feedback on your engineers visit to carry out the LEV testing and airflow indicator installation. I was very happy with the work carried out and look forward to receiving the LEV reports. Going forward I would be happy if AES would undertake our yearly LEV testing and I will also of course look to utilise yourself if any future installs are required"

Workshop Manager - Advanced Forming Research Centre (AFRC)

Our C-Vac extraction system was installed summer 2017 in our new light manufacturing workshop. The extract system was installed to our specification and we have found it easy to use. The technical aftercare from AES has been excellent any technical inquiry was dealt with a few hours of contacting them.

Technical Team Leader - Manchester Metropolitan University

"I cannot express enough how amazing the C-vac system is , from the efficient extraction to the easy dust bag change , it really is fantastic. Everything about the system is 1st class, I have worked in workshops all my working life ,30 years now , and it’s a dream to come to work and use an efficient well installed system. Staff and Students are raving about it, the feedback has been outstanding."

Architectural Model Making Technician - Glasgow School of Art

"I just wanted to say a big thank you to the team at AES for completing this installation on time. I found every member of your team very friendly, professional and they are an asset to your organisation. The quality of the work has been exceptional."

Service Manager - Teledyne GMI

Ask one of our technical team

Speak to one of our staff in our office to see how we can help with your enquiry.

Click below to find out how AES can help with your enquiry today.

Get a Quote